{"id":1584,"date":"2025-03-25T19:20:43","date_gmt":"2025-03-26T00:20:43","guid":{"rendered":"http:\/\/monitortamaulipas.com.mx\/?p=1584"},"modified":"2025-03-25T19:20:46","modified_gmt":"2025-03-26T00:20:46","slug":"red-de-carreteras-de-occidente-coopera-con-sict-en-operacion-y-conservacion-del-tramo-maravatio-irimbo-en-michoacan","status":"publish","type":"post","link":"https:\/\/monitortamaulipas.com.mx\/?p=1584","title":{"rendered":"RED\u00a0DE\u00a0CARRETERAS DE OCCIDENTE COOPERA CON SICT EN OPERACI\u00d3N Y CONSERVACI\u00d3N DEL TRAMO MARAVATIO\u2013IRIMBO, EN MICHOAC\u00c1N"},"content":{"rendered":"\n<p><strong>Esta v\u00eda forma parte del Eje Carretero&nbsp;<\/strong><strong>Maravat\u00edo<\/strong><strong>&#8211;<\/strong><strong>Zit\u00e1cuaro<\/strong><strong>&nbsp;que se modernizar<\/strong><strong>\u00e1<\/strong><strong>&nbsp;en una longitud de 72 km<\/strong><strong>,<\/strong><strong>&nbsp;con una inversi\u00f3n de 5.1 m<\/strong><strong>il&nbsp;<\/strong><strong>m<\/strong><strong>illones&nbsp;<\/strong><strong>d<\/strong><strong>e&nbsp;<\/strong><strong>p<\/strong><strong>esos<\/strong><\/p>\n\n\n\n<p>\u2022&nbsp;<strong>La obra se dividi<\/strong><strong>\u00f3<\/strong><strong>&nbsp;en 10 tramos carreteros, de los cuales 3 son libramientos para construir (Maravat<\/strong><strong>\u00ed<\/strong><strong>o, Irimbo y Tuxpan), un tramo&nbsp;<\/strong><strong>del km 8+280 al km 24+060 del proyecto ejecutivo&nbsp;<\/strong><strong>de 15.78 km, y los otros&nbsp;<\/strong><strong>6 tramos en la carretera federal&nbsp;<\/strong><strong>Zit\u00e1cuaro<\/strong><strong>-Cd. Hidalgo<\/strong><\/p>\n\n\n\n<p><a><\/a>La Secretar\u00eda de&nbsp;Infraestructura,&nbsp;Comunicaciones y&nbsp;Transportes&nbsp;(SICT), ampl\u00eda&nbsp;y moderniza,&nbsp;en coordinaci\u00f3n con la Concesionaria Red de Carreteras de Occidente&nbsp;(RCO), la carretera Maravat\u00edo-Zit\u00e1cuaro, la cual tiene una longitud de 72.36 kil\u00f3metros.<\/p>\n\n\n\n<p>El d\u00eda de hoy la SICT hace&nbsp;la entrega-recepci\u00f3n&nbsp;a la concesionaria RCO&nbsp;del tramo&nbsp;de la obra de ampliaci\u00f3n No. 8&#8243;, Ramal Maravat\u00edo-Zit\u00e1cuaro, Tramo 2, del km 8+280 al km 24+060,&nbsp;del proyecto ejecutivo&nbsp;del tramo&nbsp;Maravat\u00edo-Irimbo,&nbsp;el cual&nbsp;ser\u00e1&nbsp;libre de peaje.<\/p>\n\n\n\n<p>Dicha&nbsp;<a><\/a>obra&nbsp;se dividi\u00f3&nbsp;en 10 tramos carreteros, de los cuales 3 son&nbsp;libramientos para construir&nbsp;(Maravat\u00edo, Irimbo y Tuxpan), un tramo estatal de 15.78 km, y los otros 6 tramos&nbsp;en la carretera&nbsp;federal&nbsp;Zit\u00e1cuaro-Cd. Hidalgo.&nbsp;La inversi\u00f3n es del orden de 5&nbsp;mil&nbsp;188 millones de&nbsp;pesos y dar\u00e1 servicio diario a unos 9 mil 313 veh\u00edculos.<\/p>\n\n\n\n<p>Con esta modernizaci\u00f3n de Maravat\u00edo a Zit\u00e1cuaro se impulsa el desarrollo de la actividad econ\u00f3mica y social de la regi\u00f3n, se aumenta la seguridad vial al contar con una&nbsp;carretera&nbsp;de altas especificaciones y disminuye el n\u00famero de accidentes por rebase; adem\u00e1s, reducir\u00e1&nbsp;el tiempo de recorrido de 60 a 30 minutos.<\/p>\n\n\n\n<p>Asimismo,&nbsp;mejora la conectividad entre los municipios de Maravat\u00edo,&nbsp;Senguio,&nbsp;Irimbo, Hidalgo, Tuxpan,&nbsp;Jungapeo&nbsp;y Zit\u00e1cuaro, y proporcionar\u00e1&nbsp;un enlace r\u00e1pido entre la zona Sureste de tierra caliente del estado y del Oriente, hacia los principales mercados del Centro, Baj\u00edo y Occidente del pa\u00eds.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Esta v\u00eda forma parte del Eje Carretero&nbsp;Maravat\u00edo&#8211;Zit\u00e1cuaro&nbsp;que se modernizar\u00e1&nbsp;en una longitud de 72 km,&nbsp;con una&#8230;<\/p>\n","protected":false},"author":2,"featured_media":1585,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[7],"tags":[],"class_list":["post-1584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-monitor-nacional"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/monitortamaulipas.com.mx\/wp-content\/uploads\/2025\/03\/Nacional-9.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/1584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1584"}],"version-history":[{"count":1,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/1584\/revisions"}],"predecessor-version":[{"id":1586,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/1584\/revisions\/1586"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/media\/1585"}],"wp:attachment":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}