{"id":15678,"date":"2026-09-07T20:01:27","date_gmt":"2026-09-08T01:01:27","guid":{"rendered":"https:\/\/monitortamaulipas.com.mx\/?p=15678"},"modified":"2026-09-07T20:01:31","modified_gmt":"2026-09-08T01:01:31","slug":"concluyo-la-construccion-del-puente-amado-nervo","status":"publish","type":"post","link":"https:\/\/monitortamaulipas.com.mx\/?p=15678","title":{"rendered":"Concluy\u00f3 la construcci\u00f3n del Puente Amado Nervo\u00a0"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">\u25cf Esta obra estrat\u00e9gica beneficiar\u00e1 a m\u00e1s de 479 mil habitantes de ambas entidades \u25cf Las personas usuarias se ahorrar\u00e1n 25 minutos en los recorridos entre la Riviera Nayarit y Puerto Vallarta<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Puente Amado Nervo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Gobierno de M\u00e9xico, a trav\u00e9s de la Secretar\u00eda de Infraestructura, Comunicaciones y Transportes (SICT), que encabeza Jes\u00fas Esteva Medina, informa que concluy\u00f3 la construcci\u00f3n del Puente Amado Nervo, que conecta a los municipios de Bah\u00eda de Banderas, en Nayarit, y Puerto Vallarta, en Jalisco.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En esta obra estrat\u00e9gica se invirtieron 704 millones de pesos (mdp) y durante los trabajos se generaron 2 mil 790 empleos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Paso Superior Vehicular cruza el r\u00edo Ameca y beneficiar\u00e1 a 479 mil 471 habitantes de la regi\u00f3n, quienes se ahorrar\u00e1n 25 minutos en los traslados entre la Riviera Nayarit y Puerto Vallarta.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se trata de una v\u00eda alterna que agilizar\u00e1 el tr\u00e1nsito de veh\u00edculos que tienen como origen o destino la zona metropolitana de ambos centros tur\u00edsticos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De hecho, representa una soluci\u00f3n para fortalecer la conectividad regional, reducir la congesti\u00f3n vehicular, mejorar la movilidad tur\u00edstica y disminuir las emisiones de contaminantes derivadas del tr\u00e1fico.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Puente Amado Nervo tiene 2 km de longitud \u2014800 metros de estructura y mil 220 metros de accesos\u2014 tres carriles por sentido, 21 apoyos tipo pilote-columna, 20 claros de 40 metros, 126 pilotes de 1.5 metros de di\u00e1metro y 160 trabes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para su construcci\u00f3n se utilizaron 2 mil 970 toneladas de acero en estructura, 218 toneladas de acero en accesos, 18 mil 500 metros c\u00fabicos de concreto en estructura y 12 mil 200 metros c\u00fabicos de concreto en accesos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las obras iniciaron en julio de 2025 y estaban programadas para terminarse en diciembre de este a\u00f1o, pero finalizaron antes de la fecha prevista.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El Puente Amado Nervo se consolida como uno de los proyectos prioritarios del Programa Nacional de Infraestructura Carretera 2025-2030, cuyo objetivo es desarrollar infraestructura que promueva la inclusi\u00f3n social, la sostenibilidad y el desarrollo equilibrado del territorio.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u25cf Esta obra estrat\u00e9gica beneficiar\u00e1 a m\u00e1s de 479 mil habitantes de ambas entidades \u25cf&#8230;<\/p>\n","protected":false},"author":2,"featured_media":15679,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7],"tags":[],"class_list":["post-15678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-monitor-nacional"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/monitortamaulipas.com.mx\/wp-content\/uploads\/2026\/09\/Nacional-1-4.jpeg","_links":{"self":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/15678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15678"}],"version-history":[{"count":1,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/15678\/revisions"}],"predecessor-version":[{"id":15680,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/posts\/15678\/revisions\/15680"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=\/wp\/v2\/media\/15679"}],"wp:attachment":[{"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monitortamaulipas.com.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}